R&D Claim Assurance · Demonstrator

Northstar Software Ltd

Claim RDC-2026-0017 · 2025-04-01 to 2026-03-31 · Adviser review required

4 evidence documents

1 technical project · 2 proposed cost records

Start a claim

Choose the evidence source

Preloaded synthetic evidence

Northstar seeded claim pack

A synthetic project narrative, experiment log and cost records are ready. Initiating the claim runs the deterministic assurance checks and exposes the seeded evidence gaps.

Ready
  • Project Technical Narrative.pdf2-page technical narrative
  • Engineering Experiment Log.pdf3-page experiment record
  • Payroll Summary.xlsxFormula-backed payroll scheduleDownload
  • Cloud Cost Export.xlsx12-month cloud cost exportDownload

Initiate claim assurance

Structure project assertions and costs, preserve their provenance, then surface missing or unsupported claim evidence.

Stage 01

Evidence selected

4 documents ready for the demonstration.

Stage 02

Facts structured

Projects, technical assertions and proposed costs.

Stage 03

Findings generated

Completeness and justification remain independent.